Manage Requirements

Manage requirements and architecture model together in the Requirements perspective from Simulink® Requirements™. Select Apps > Requirements Manager.

The 'Robot with Reqs' model with components named 'Sensor', 'Trajectory Planning', and 'User Interface' with a requirements perspective below it with 'Robot Requirements' listed.

When you click a component in the Requirements perspective, linked requirements are highlighted. Conversely, when you click a requirement, the linked components are shown.

Selected component 'Command' and linked requirement shown below as 'Trajectory Planning'.

To directly create a link, drag a requirement onto a component.

Clicking and dragging 'Battery life' requirement to the 'Battery' component.

You can close the annotation that shows the link as necessary. This does not delete the link.

You can exit the Requirements perspective by clicking the perspectives menu on the lower-right corner of the architecture model and selecting Exit perspective.

Exit perspective menu option from lower right hand corner.

For more information on managing requirements, see Manage Navigation Backlinks in External Requirements Documents (Simulink Requirements).

Related Topics